Nanshan WTE power plant
The demonstration project built through introducing foreign advanced equipment
Acquired in Jan of 2014
  • 2*300T/D
    Waste processing capacity
    12MW
    Capacity
    Flue Gas emission:
    EU standard complied
  • Parallel session of Shenzhen International Life Science Fair
    Nationwide waste incinerator harmless levelAA grade assessment
    Ten typical cases of 2010 solid waste management
    Longyan WTE power plant of Fujian

    Nanshan WTE Power Plant is the demonstration project built through introducing foreign advanced equipment. It was formally put into production in December 2003. The construction scale is 800 tons of daily living waste processing, equipping with two waste incinerators of 400 tons/day, one 12 MW steam turbine generator set, with the total investment being about RMB 380 million and the floor space is 56000 square meters. The incinerator is the tilting multistage grate furnace imported from Belgium West Gus Company. In nationwide waste incinerator harmless level assessment, Nanshan WTE Power Plant won AA grade assessment.