YanTian WTE power plant
National level built after digesting, absorbing and introducing technology
Nationalization equipment demonstration project
Commercial operation started in Dec.2003
  • 2*225T/D
    Waste processing capacity
    16MW
    Capacity
    Flue Gas emission:
    EU standard complied

    Yantian WTE Power Plant is the national level nationalization equipment demonstration project built after digesting, absorbing and introducing advanced technology. It was constructed and put into operation in December 2003. The scale is 450 tons of Household waste processing, equipping with two waste incinerators of 225 tons/day, one 6.5 MW steam turbine generator set, which is only existing domestic complete waste and sludge incineration processing plant integrated with waste incineration, sludge incineration, generating electricity, leachate treatment, ash disposal technology.


    This plant adopts nationalization of SEEE—SEGHERS waste incinerator, possessing today's world advanced level, which is very suit for incinerating the waste of high moisture low calorific value. The "tilting reciprocating ladder waste incinerator and power generation technology equipment nationalization project" implemented by this plant is evaluated as "National Resources Saving and Environmental Protection Major Demonstration Project" by State Economic and Trade Commission. In nationwide waste incinerator harmless level grade assessment, Yantian WTE Power Plant won AA grade assessment.