Baoan phase 1 WTE power plant
Waste incineration rating grade assessment AAA grade (the highest grade) assessment
Commercial operation started in May,2006
  • 3*400tons/day
    Waste processing capacity
    212MW
    Capacity
    Flue Gas emission:
    EU standard complied
    Longyan WTE power plant of Fujian

    Baoan WTE Power Plant was constructed and put into operation in December 2005. The scale is 1200 tons/day, equipping with three waste incinerators of 400 tons/day, two 12 MW steam turbine generator sets. Its incinerator is multistage tilting reciprocating grate boiler imported from Belgium West Gus Company.


    Baoan WTE Power Plant won Chinese Renewable Energy Industry Bluesky Award.


     In nationwide waste incinerator harmless level grade assessment, Baoan WTE Power Plant won AAA grade (the highest grade) assessment.